作 者:薛孟斌 张宇飞 雷超雯 惠寅涛 白建超 Xue Mengbin;Zhang Yufei;Lei Chaowen;Hui Yintao;Bai Jianchao(Northwest Branch of CSCEC Xinjiang Construction&Engineering(Group)Co.,Ltd.,Xi’an Shaanxi 710000,China)
出 处:《城市建筑》2019年第24期116-117,136,共3页Urbanism and Architecture
摘 要:本文通过对桃园路管廊隧道的工程特点、水文地质情况进行分析,决定采用"一次性导向跟管钻进法"施工大管棚,对隧道前方土体进行超前支护,确保管廊隧道地层安全可靠,并进一步阐述了长80 m的大管棚在富水砂层中采用"一次性导向跟管钻进法"施工工艺流程及关键技术要点,为日后类似地层条件的施工提供宝贵的经验及相关技术支持。Based on the analysis of the engineering characteristics and hydrogeology of the tunnel of Taoyuan road, it was decided to use the "one-time guided pipe drilling method" to construct a large pipe shed to provide advance soil support in front of the tunnel so as to ensure the safety and reliability of tunnel strata reinforcement. This paper further expounds the construction process and key technical points of 80 m long pipe shed in the water-rich sand layer using the "one-time guided pipe drilling method". It provides valuable experience and relevant technical support for the construction of the corresponding strata conditions in the future.
关 键 词:管廊隧道工程 富水砂层 80 m长管棚 管棚施工 跟管钻进法
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15