检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓云川[1] 林宗良[1] DENG Yunchuan;LIN Zongliang
机构地区:[1]中铁二院工程集团有限责任公司电化院
出 处:《电气化铁道》2019年第S01期5-11,15,共8页Electric Railway
摘 要:作为缺乏有力电网支撑的复杂大坡道高原山区高标准电气化铁路,川藏铁路电气化工程外部电源系统总体薄弱,需要大规模配套建设,牵引供电系统方案应与外部电源系统方案紧密衔接,整体化研究,一体化实施;电气化工程所处环境非常严酷,需要对电气设备绝缘开展分析、研究、论证,确定合理的绝缘海拔修正系数,并开展电气绝缘配合方案的相关研究论证;工程实施条件非常困难,对电气化系统方案的简约化、集成化、紧凑化等提出了很高的要求;技术要求非常特殊,对牵引变电所供电能力、电源备用方式、大坡道分相处理方案、变电设备适应性、接触网安全性和可靠性等诸多方面提出了极为特殊的要求。此外,上述问题和困难交织叠加相互作用,构成了更为复杂的需求和挑战。本文围绕上述需求和挑战,结合川藏线具体情况进行论述和分析,以目前开展的相关工作为基础,经过思考和深化提出解决方案和对策思路。The external power supply system for Sichuan-Tibet railway electrification project,a high standard plateau and mountain electrified railway,which is lack of support of powerful supporting power grid and is of steep slope,is weak in the whole,and requires large scale supporting construction.The traction power supply system scheme shall be closely connected to the external power supply system scheme,require integrated study and integrated implementation;the railway electrification engineering locates in a very severe environment,which requires the development of analysis,study,illustration on electrical equipment so as to determine the insulation altitude correction coefficient,and require to develop relative study and illustration of electrical insulation coordination;the most difficult engineering implementation conditions bring forward higher requirements on simplicity,integration and compactness of electrification system scheme;most severe technical requirements bring forward most special requirements on several aspects of traction power supply capability,power supply reservation mode,disposal scheme for phase break setting on steep slope,adaptability of substation equipment,safety and reliability of OCS.Moreover,the intersecting and disposing of the above mentioned problems from more complicated demands and challenges.The paper,centering on the above mentioned requirements and challenges,connecting to the illustration and analysis of the actual situations of Sichuan-Tibet railway line,with the relative work implemented at present as the basis,the resolution schemes,counter measures and ideas are put forward after profound consideration.
关 键 词:川藏铁路 建设方案 牵引供电系统 工程实施条件困难 对策
分 类 号:U221[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222