检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yanbin Wang Deli Gao Jun Fang
机构地区:[1]MOE Key Laboratory of Petroleum Engineering,China University of Petroleum,Beijing102249,China
出 处:《Computer Modeling in Engineering & Sciences》2016年第4期357-373,共17页工程与科学中的计算机建模(英文)
基 金:The authors gratefully acknowledge the financial support from the Natural Science Foundation of China(NSFC,51221003,U1262201);This research is also supported by other projects(Grant numbers:2013AA064803,2011ZX05009-005).
摘 要:This paper is concerned with the problem of longitudinal vibration of a 3,000 m long disconnected drilling riser during installation and hangoff operation.The natural frequency,amplitude of vibration displacement and vibration force of longitudinal vibration have been determined with consideration of the damping effect of the sea water.Results show the natural frequency of riser under these two situations are both decrease with the increase of water depth.The natural frequency of riser in installation operation is bigger than that in hangoff operation.The vibration displacement in hangoff configuration is bigger than that in installation while the vibration force in hangoff configuration is smaller than that in installation configuration.Under the condition of resonance,the vibration displacement increase along riser from top end to the bottom end while the vibration force increase along riser from riser bottom end to the top end.
关 键 词:MARINE RISER INSTALLATION Hangoff Longitudinal VIBRATION
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46