Application of coupled XFEM-BCQO in the structural optimization of a circular tunnel lining subjected to a ground motion  被引量:1

在线阅读下载全文

作  者:Nazim Abdul NARIMAN Ayad Mohammad RAMADAN Ilham Ibrahim MOHAMMAD 

机构地区:[1]Department of Civil Engineering,Tishk International University-Sulaimani,Sulaimaniya 46001,Iraq [2]Mathematics Department-College of Science,Sulaimani University,Sulaimaniya 46001,Iraq

出  处:《Frontiers of Structural and Civil Engineering》2019年第6期1495-1509,共15页结构与土木工程前沿(英文版)

摘  要:A new structural optimization method of coupled extended finite element method and bound constrained quadratic optimization method(XFEM-BCQO)is adopted to quantify the optimum values of four design parameters for a circular tunnel lining when it is subjected to earthquakes.The parameters are:tunnel lining thickness,tunnel diameter,tunnel lining concrete modulus of elasticity and tunnel lining concrete density.Monte-Carlo sampling method is dedicated to construct the meta models so that to be used for the BCQO method using matlab codes.Numerical simulations of the tensile damage in the tunnel lining due to a real earthquake in the literature are created for three design cases.XFEM approach is used to show the cracks for the mentioned design cases.The results of the BCQO method for the maximum design case for the tunnel tensile damage was matching the results obtained from XFEM approach to a fair extent.The new coupled approach manifested a significant capability to predict the cracks and spalling of the tunnel lining concrete under the effects of dynamic earthquakes.

关 键 词:ovaling deformation MONTE carlo sampling XFEM-BCQO MAXIMUM principal stress 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象