检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鄢发齐 李姚旺 汪旸 徐浩 苗世洪 周良松 姚占东 沈宇亮 YAN Faqi;LI Yaowang;WANG Yang;XU Hao;MIAO Shihong;ZHOU Liangsong;YAO Zhandong;SHEN Yuliang(Central China Electric Power Dispatching and Control Sub-center of State Grid,Wuhan 430077,China;Hubei Electric Power Security and High Efficiency Key Laboratory,State Key Laboratory of Advanced Electromagnetic Engineering and Technology,School of Electrical and Electronic Engineering,Huazhong University of Science and Technology,Wuhan 430074,China)
机构地区:[1]国家电网华中电力调控分中心,湖北武汉430077 [2]华中科技大学电气与电子工程学院强电磁工程与新技术国家重点实验室电力安全与高效湖北省重点实验室,湖北武汉430074
出 处:《电力自动化设备》2019年第12期73-81,共9页Electric Power Automation Equipment
基 金:国家自然科学基金资助项目(51777088);国家重点基础研究发展计划(973计划)项目(2015CB251301)~~
摘 要:为了应对大规模风电接入,压缩空气储能(CAES)技术和柔性负荷主动响应技术在近年来发展迅速。以含CAES电站、可转移负荷、可中断负荷、可直接负荷控制(DLC)负荷、风电场、常规机组的电力系统为研究对象,综合考虑CAES电站和多类型柔性负荷在日前、日内、实时时间尺度下的调度特性及其在备用与调频方面的应用潜能,建立考虑源-荷-储协调互动的电力系统多时间尺度电能-备用联合调度模型。该模型以最小化电网运营商的总支出成本为优化目标,能够同时制定系统的发电计划、旋转备用购置与调用计划和自动发电控制(AGC)参与因子配置计划。基于修改版PJM-5Bus系统的仿真结果验证了所建调度模型的有效性。In order to cope with the integration of large-scale wind power,CAES(Compressed Air Energy Storage)technology and flexible load active response technology have been developed rapidly in recent years.Taking the power system with CAES plants,TLs(Time-shifting Loads),ILs(Interruptible Loads),DLC(Direct Load Control)loads,wind farms and conventional generators as the research object,comprehensively considering the dispatch characteristics of CAES plants and multi-type flexible loads in day-ahead,intra-day and real-time scales and their application potential in reserve and frequency modulation,a multi-time scale joint dispatch model of energy and reserve is established for power system,which considers the source-loadenergy storage coordination.The proposed model takes the minimum total cost of grid operators as the opti?mization objective,and can simultaneously set up the power generation plan,the reserve purchase and dis?patch plan and the allocation plan of AGC(Automatic Generation Control)participation factors.Simulative results of the modified PJM-5Bus system verify the effectiveness of the proposed dispatch model.
关 键 词:压缩空气储能 柔性负荷 多时间尺度调度 有功优化 备用优化 联合优化 电力系统 模型
分 类 号:TM734[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.23.110