检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宛士春[1] 杨立常 WAN Shichun;YANG Lichang(Qinghai University,Qinghai 810003,China;Central China Branch of State Grid Corporation of China,Wuhan 430077,China)
机构地区:[1]青海大学,青海西宁810003 [2]国家电网有限公司华中分部,湖北武汉430077
出 处:《水电与新能源》2019年第11期27-31,共5页Hydropower and New Energy
摘 要:论证开发固体荷载升位蓄能电站的必要性、紧迫性和可行性,并通过对比分析论证热力蓄能电站优于抽水蓄能电站与其他类型蓄能电站的若干特质与属性;提出研发热力蓄能型固体荷载升位蓄能电站的技术路线与方法、步骤;研发系统结构组成方案,为模型制作与模型试验提供重要依据。The solid load rising energy storage power station is a novel energy storage solution.The necessity,urgency and feasibility of the development of such power stations are analyzed.Then,the specific advantages and characteristics of the thermal power based energy storage power station are demonstrated by comparing with the pumped storage and other type storage power stations.The technical roadmap and development scheme of the thermal power based solid load rising energy storage power station are proposed.Also,the structural composition scheme of the system is suggested,which provides an important basis for the model construction and testing.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38