葛洲坝电厂19号机组改造增容分析  被引量:2

Capacity Expansion of the No.19 Generator Unit in Gezhouba Hydropower Plant

在线阅读下载全文

作  者:付国宏 秦风斌 李文金[1] 雷秉惠 金龙兵 FU Guohong;QIN Fengbin;LI Wenjin;lEI Binghui;JIN longbing(China Yangtze Power Co.,Ltd.,Yichang 443002,China)

机构地区:[1]中国长江电力股份有限公司

出  处:《水电与新能源》2019年第11期75-78,共4页Hydropower and New Energy

摘  要:为了充分利用水能资源,提高机组运行可靠性,增加发电量、提高效益,针对葛洲坝电厂19号机组的改造增容,首先对其可行性进行了分析,然后对定子铁芯、定子线棒、转子磁极线圈等方面进行了技术改造。通过对安装质量和工艺水平的检验,各项技术指标均满足要求。In order to make full use of hydropower energy resources, improve the operation reliability and increase the power generation benefit, the No.19 generator unit in Gezhouba Hydropower Plant is renovated to expand its capacity. The feasibility of the capacity expansion is firstly analyzed. Then, technical renovation schemes are proposed and implemented on the stator core, stator bar and rotor pole coil. Inspection of the installation quality and the renovation technology shows that the technical requirements are all satisfied.

关 键 词:葛洲坝电厂 发电机 改造增容 绝缘等级 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象