检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘美义[1] 孙勇[1] 王桂生[1] 万文新 LIU Mei-yi;SUN Yong;WANG Gui-sheng;WAN Wen-xin(China Water Huaihc Planning,Design and Research Co.,LTD.,Hefei 230001,China)
机构地区:[1]中水淮河规划设计研究有限公司
出 处:《水电能源科学》2019年第12期70-72,共3页Water Resources and Power
摘 要:鉴于徐楼闸老闸因闸基渗透、上下游冲刷而损坏,移址改建的徐楼闸新闸必须解决闸基深厚粉细砂层渗透能力强、不耐冲刷的问题,采用闸基换填水泥土、闸基设置截渗墙、下游消力池末端设置防冲墙等加固补强措施,就可有效减弱粉细砂的渗透问题,并可有效提高闸基的抗冲能力,从而确保闸基稳定安全运行。In view of the fact that the old gate of Xulouzha was damaged by the infiltration of the gate base and the erosion of the upper and lower reaches,the relocation of the new gate of Xulouzha must solve the problem that the deep fine sand layer of the gate base has strong permeability and is not resistant to erosion.Reinforcement measures,such as replacing cement and soil with sluice foundation,setting up interception wall on sluice base,and setting up anti-punching wall at the end of downstream stilling basin,can effectively weaken the permeability of fine sand and improve the impulse resistance of sluice base.Thus,it ensures the stable and safe operation of sluice base.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222