BTA深孔钻削系统振动测试实验研究  

Experimental Study on Vibration Test of BTA Deep Hole Drilling System

在线阅读下载全文

作  者:王睿 辛志杰[1,2] 张晓飞 张燕[1,2] 石慧林 Wang Rui;Xin Zhijie;Zhang Xiaofei;Zhang Yan;Shi Huilin(North University of China,Taiyuan 030051,China;Deep Hole Processing Engineer and Technology Research Center of Shanxi Province,Taiyuan 030051,China)

机构地区:[1]中北大学,太原030051 [2]山西省深孔加工工程技术研究中心,太原030051

出  处:《煤矿机械》2019年第11期53-56,共4页Coal Mine Machinery

摘  要:深孔加工进给至中末期,加工孔出现影响圆度误差和表面质量的周期性多瓣形振纹。鉴于BTA深孔钻削加工系统特点,开展振动测试实验研究。实验前,将钻削系统三维模型导入分析软件中进行模态计算;根据模拟初步分析结果对加速度传感器测点位置进行预判,并对测试仪器进行安装调试。迭代验证模拟分析结果和实验结果以优化分析模型,同时对实验方案进行改进和修正。经对比发现软件计算结果和实验分析结果较为相近,可保证实验方案可行性。对锤击信号和实验中前3阶模态及单峰值谱进行分析,发现钻削系统径向异常振动明显。Multi-periodic vibration pattern which affect roundness error and surface quality in deep hole machining feed to the middle and late stage.In view of the characteristics of the BTA deep hole drilling system,the vibration test experimental research was carried out.Before the experiment,the 3 D model of the drilling system was imported into the analysis software for modal calculation.According to the preliminary analysis results of the simulation,the position of the accelerometer measuring point was prejudged,and the test instrument was installed and debugged.The simulation results and experimental results were iteratively verified to optimize the analytical model,and the experimental scheme was improved and modified.By comparison,it is found that the calculated results of the software are close to the experimental analysis results,which can ensure the feasibility of the experimental program.It is found that the abnormal radial vibration of drilling system is obvious by analyzing the hammer strike signal and the first three modes and single peak spectrum in the experiment.

关 键 词:BTA钻削系统 测点位置 迭代验证 实验模态 

分 类 号:TG52[金属学及工艺—金属切削加工及机床] TH161.6[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象