检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韦贞景 WEI Zhen-jing(Guangxi Datengxia Gorge Water Conservancy Development Co.Ltd.,Nanning 530299,China)
机构地区:[1]广西大藤峡水利枢纽开发有限责任公司
出 处:《广西水利水电》2019年第6期5-8,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:武宣盘龙铅锌矿矿区堵水帷幕沿线岩溶发育复杂,初步设计阶段布置排距3 m的双排孔,孔间距6 m,深度一般超过200 m。在施工中,当钻孔帷幕深度超过200 m,孔距大于4 m,我们将面临更为复杂的技术问题。通过灌浆试验,探索了大孔距深孔岩溶堵水帷幕灌浆排数、排距、孔距、孔深等灌浆技术参数,为优化设计、降低工程造价、保证工程质量等提供依据。Karst is developed and complicated along the water plugging curtain of Panlong lead-zinc mining area of Wuxuan County.At the preliminary design stage,double rows of holes with array pitch of 3 m,hole spacing of 6 m and hole depth over 200 m had been designed.When the drilling curtain depth exceeds 200 m and the hole-spacing is over 4 m,the construction will have more complicated technical problem.Grouting tests were conducted to study the technical parameters of large-spacing deep-hole karst water plugging curtain grouting including the number of arrays,array pitch,hole-spacing and hole depth etc.,which provide basis for design optimization,cost reducing and guarantee of construction quality.
分 类 号:TV543.15[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15