检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴伟[1] 周晨[1] 唐玉宏[1] 张树俊 Wu Wei;Zhou Chen;Tang Yuhong;Zhang Shujun(Nanjing Municipal Design&Research Insitutc Ltd.,210008,China)
机构地区:[1]南京市市政设计研究院有限责任公司
出 处:《特种结构》2019年第6期88-92,共5页Special Structures
摘 要:本文结合市政工程实例,采用公式简化计算法、有限元简化计算法和有限元整体计算法,计算水池长度、地基水平阻力系数Cx取值对超长水池池体温度应力的影响根据计算所得温度应力,通过提高混凝土的配筋率、严格执行构造和施工措施来降低温度应力的影响,从而适当调整伸缩缝间距,并满足裂缝控制要求。为优化超长水池的结构方案提供理论和数值依据。In order to analyze the influence of the length of water tank and the coefficient of horizontal resistance of foundation(C_x) on the temperature stress of overlength water tank,an example of municipal engineering was analyzed by using simplified formula calculation method,the method of simplified finite element and integral finite element method.According to the results of temperature stress,the influence of temperature stress can be reduced by increasing the reinforcement ratio of concrete,strictly implementing the constructional measures and construction measures.And then the requirements of crack control can be satisfied by appropriatly adjusting the spacing of expansion joint.The study provided theoretical and numerical basis for optimizing the structural scheme of overlength water tank.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229