综放工作面过地质构造矿压分析与探讨  被引量:1

Analysis and Discussion of the Over-the-geological Structure of the Fully-mechanized Caving Face

在线阅读下载全文

作  者:刘旭东 Liu Xudong(No.1 Mine of Yangquan Coal Industry(Group)Co.,Ltd.,Yangquan Shanxi 045008)

机构地区:[1]阳泉煤业(集团)有限责任公司一矿

出  处:《机械管理开发》2019年第12期277-278,共2页Mechanical Management and Development

摘  要:为系统总结综放工作面矿压规律,通过在81203工作面使用ZF6200型液压支架,对工作面的矿压规律进行了总结分析,解决了工作面过构造期间的顶板管理难题,实现了和工作面设备的有机配套,为工作面正常生产提供了装备保障。In order to systematically summarize the mine pressure law of fully mechanized top coal caving face,the mine pressure law of working face is summarized and analyzed by using ZF6200 hydraulic support in 81203 working face,the difficult problem of roof management during working face passing through structure is solved,and the organic matching with working face equipment is realized,which provides equipment support for normal production of working face.

关 键 词:综放工作面 液压支架 矿压分析 

分 类 号:TD327.23[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象