多巷布置充填留巷围岩变形特征及补强支护技术  被引量:4

Deformation Characteristics and Reinforcement Support Technology of Surrounding Rock in MultiLane Filling and Retaining Roadway

在线阅读下载全文

作  者:玄忠堂 赵善坤 杨晓成 杨勇 吕坤 XUAN Zhongtang;ZHAO Shankun;YANG Xiaocheng;YANG Yong;LYU Kun(Mine Safety Technology Branch of China Coal Research Institute,Beijing 100013,China;College of Resources&Safety Engineering,China University of Mining&Technology(Beijing),Beijing 100083,China;National Key Lab of Coal Resource High Efficient Mining and Clean Utilization,Beijing 100013,China;Technical Center of Yangquan Coal Group Co.,Ltd.,Yangquan 045000,China)

机构地区:[1]煤炭科学技术研究院有限公司安全分院,北京100013 [2]中国矿业大学(北京)资源与安全工程学院,北京100083 [3]煤炭资源高效开采和洁净利用国家重点实验室,北京100013 [4]阳泉煤业集团有限责任公司技术中心,山西阳泉045000

出  处:《煤矿安全》2019年第10期93-97,共5页Safety in Coal Mines

基  金:国家重点研发计划资助项目(2017YFC0804205,2017YFC0804201);国家自然科学基金资助项目(51574150,51704159,51674143)

摘  要:为解决新元煤矿多巷布置充填留巷动压巷道围岩变形严重问题,采用现场监测巷表面位移变化特征、超前支承应力变化规律及数值模拟巷道塑性区的变化规律,并根据原有支护形式的不足,提出适合多巷巷道大变形问题支护优化方案,并在井下进行优化补强支护工业性试验。实测结果表明:巷道围岩在进入超前支承压力影响范围后开始变形,但变形量不大;原支护方案在工作面推过后,巷道底鼓急剧增加,根据现场观测和数值模拟分析塑性区的变化规律,优化支护后的补强措施顶板、两帮的移近量均有减小,底鼓量减小了约50%,优化补强支护方案改善了巷道围岩质量。In order to solve the serious problem of surrounding rock deformation of dynamic pressure roadway with multiple roadway layout and filling entry retaining in Xinyuan Coal Mine,based on the field monitoring characteristics of roadway surface displacement change,leading supporting stress change law and numerical simulation of roadway plastic zone change law,and according to the deficiency of the original supporting form,the support optimization scheme suitable for large deformation of multiroadway roadway is proposed,and the industrial test of optimized reinforcing support is carried out in underground.The measured results show that the surrounding rock starts to deform after it enters the influence area of abutment pressure,but the deformation amount is not large;after the original support scheme was applied in working face,the floor heave of the roadway increased sharply.According to the field observation and numerical simulation analysis of the change law of the plastic zone,both the roof and the two sides of the reinforcement measures after the optimization of support were reduced,and the floor heave was reduced by about 50%.The optimization of the reinforcement scheme improved the quality of the roadway surrounding rock.

关 键 词:充填留巷 动压巷道 超前支承应力 补强支护 数值模拟 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象