检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张盛行 汤雷[1] 贾宇[1,2] 罗明锴 ZHANG Shenghang;TANG Lei;JIA Yu;LUO Mingkai(Materials&Structural Engineering Department,Nanjing Hydraulic Research Institute,Nanjing 210029,China;College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China;College of Civilaviation,Nanjing University of Aeronautics and Astronautics,Nanjing 210016,China)
机构地区:[1]南京水利科学研究院材料结构研究所,江苏南京210029 [2]河海大学水利水电学院,江苏南京210098 [3]南京航空航天大学民航学院,江苏南京210016
出 处:《人民长江》2019年第12期169-176,共8页Yangtze River
基 金:国家重点研发计划项目(2016YFC0401610);国家自然科学基金重点项目(51739008);中央级公益性科研院所基本科研业务费专项资金(Y17010)
摘 要:渗漏是堤坝的高发病害,也是汛期溃堤、溃坝的先兆险情,快速封堵水下渗漏通道对堤坝应急抢险具有重要的工程意义。当前处理渗漏病害的方法多种多样,但针对汛期快速堵漏仍存在各种不足,尤其是对堤坝水下渗漏通道的应急封堵存在不适用性。为解决上述问题,提出了一种水下熔化相变材料应急封堵渗漏通道的新方法,研发出相应的水下加热设备并对相变封堵材料进行了测试。通过多次室内水下封堵试验,得出了相变封堵材料水下加热后的熔化规律,总结了相变封堵材料水下熔化后的扩散规律和对渗漏通道封堵机制,验证了该方法用于应急封堵堤坝水下混凝土界面渗漏的可行性。在此基础上开展混凝土面板上渗漏通道封堵的现场试验,结果表明该方法可实现对水下混凝土界面渗漏通道的高效封堵。相关经验可供类似工程运行管理单位及人员借鉴。Leakage is not only the high incidence disease of dam or dike,but also the pre-warning signal for dam and dike collapse in flood season,and the rapid plugging for leakage passage is of great significance to the emergency rescue of the dam or dike.There are many methods to deal with the leakage disease at present,but there are still a variety of defects in rapid leak-stopping in flood season,especially for the emergency plugging of the underwater leakage passage of the dam.In order to solve the above problems,a new method by melting phase change material was provided,and the corresponding underwater heating equipment was developed and the phase change plugging material was tested.Through many indoor underwater plugging tests,the melting law of phase change plugging material after underwater heating was obtained,and the diffusion law of phase change plugging material after underwater melting and the plugging mechanism of leakage passage were summarized.The feasibility of this method for emergency plugging underwater concrete interface leakage of dike was verified.On this basis,the field test of leakage passage plugging on concrete slabs was carried out.The results showed that this method can plug the leakage passage of underwater concrete interface efficiently,which can provide reference for similar projects.
关 键 词:堤坝渗漏 水下渗漏封堵 相变材料 熔化过程 加热设备
分 类 号:TV223.4[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31