荒沟抽蓄下水库进/出水口水下施工方案研究  

Study on underwater construction scheme for intake and outlet of lower Huanggou pumped and storage power reservoir

在线阅读下载全文

作  者:房国忠 张喜武[2] 陈俊杰[2] 温斌[2] 闫涵 FANG Guo-zhong;ZHANG Xi-wu;CHEN Jun-jie;WEN Bin;YAN Han

机构地区:[1]国家电网东北分部,辽宁沈阳110180 [2]中水东北勘测设计研究有限责任公司,吉林长春130021

出  处:《东北水利水电》2019年第12期1-3,71,共4页Water Resources & Hydropower of Northeast China

摘  要:文章分析了荒沟抽水蓄能电站,下水库进/出水口原降水位施工方案存在的问题和不足,开展了相关专题研究和调研工作。水下施工方案避免了施工期大幅降低库水位避免水资源浪费、避免大量清洁水电能源损失、不需寻找大容量替代调峰电源、降低火电为主的电网调度难度,保障电网运行安全,同时降低施工对环境不利影响,避免给库区及周边人民生产、生活带来不必要的影响和损失;填补国内乃至国际水电行业大规模、高精度水下施工技术的空白,为类似工程提供技术参考。The paper analyzes the existing questions and deficiency of the original reduce the water level construction scheme for the intake and outlet of the lower Huanggou pumped and storage power reservoir, and the related monographic study and investigation work are carried out. The underwater construction scheme avoids some problems caused by the large reduction of reservoir water level during the construction period. The problems includes that, it could avoid the water resources waste and loss of large scale of clean hydroelectric energy, it not need to find large capacity alternative peak-regulation power supply and could reduce the scheduling difficult of the power grid which is mainly with the thermal power, it could ensure the operation safety of the power grid, reduce the adverse effect of the construction to the environment, and avoid the adverse influence and loss of the production and life of the people around, it could filled the gaps of large scale and high precision underwater construction in hydropower industry at home and abroad and provide technique reference for similar project.

关 键 词:抽水蓄能电站 水下施工 混凝土配合比 絮凝剂 复合模板 

分 类 号:TV312[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象