检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:匡铁军[1] 刘务全 崔延双 Kuang Tiejun;Liu Wuquan;Cui Yanshuang(Yungang Mine of Datong Coal Mine Group Co.,Ltd.,Datong Shanxi 037017,China)
机构地区:[1]大同煤矿集团有限责任公司云冈矿
出 处:《同煤科技》2019年第6期1-4,F0002,共5页Datong Coal Science & Technology
摘 要:本文针对某矿井12#层410盘区51045巷在掘进过程中可能存在小窑破坏区积水的难题,在原有瞬变电磁超前物探的基础上,提出了采用多次瞬变超前物探解释成果叠加的综合解释方法,根据成果的公共异常区,指导超前探孔的设计,达到降低体积效应的目的,探测结果与钻探验证情况基本吻合,取得了良好的应用效果,提高瞬变超前物探探测精度,为巷道的安全高效掘进提供可靠依据。In view of the problem that there may be goaf water in 51045 tunnel at 410 panel area of No.12 coal seam,on the basis of the original TEM advanced geophysical exploration,a comprehensive interpretation method based on the superposition of multiple transient geophysical interpretation results is proposed,according to the results of the public abnormal area, guide the design of the advance exploration hole, achieve the purpose of reducing the volume effect, the detection results are basically consistent with the drilling verification, and achieve good application effect, improve the detection accuracy of the transient advance geophysical exploration, and provide a reliable basis for the safe and efficient tunneling of the tunnel.
分 类 号:TD743[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.177