检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵敏寿 毛燕花 Zhao Min-shou;Mao Yan-hua
机构地区:[1]金安桥水电站,云南大理674100
出 处:《电力系统装备》2019年第23期217-218,共2页Electric Power System Equipment
摘 要:很多水电项目因为工程庞大,在施工期间不可避免地会影响周围的生态环境。因此施工方必须重视水电站施工期间的环保工作,积极做好环境保护、水土保持和工程施工,使三者协调进行,最大程度地避免水利施工影响到自然环境。本文深入分析了水电站环境保护和水土保护工作的管理与实践。Many hydropower projects,because of their huge size,cannot avoid affecting the surrounding natural environment during construction.Therefore,the construction company must pay attention to the environmental protection work during the hydropower construction period,actively do a good job in environmental protection,water and soil conservation and engineering construction,so that the three aspects can be carried out in coordination,to avoid the impact of water conservancy construction on the natural environment to the greatest extent.This paper analyzes the management practice of environmental protection and water and soil protection of hydropower station.
分 类 号:X322[环境科学与工程—环境工程] S157[农业科学—土壤学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28