检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁秋霜 邓成进[1] 王亚娥 YUAN Qiushuang;DENG Chengjin;WANG Ya'e(PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出 处:《西北水电》2019年第6期104-107,共4页Northwest Hydropower
摘 要:某水电站冲沙孔在施工期即发生破裂坍塌事故,采用ANSYS建立冲沙孔段的三维有限元模型,对冲沙孔结构进行复核计算分析。通过应力图计算结构配筋,与实际配筋对比,分析冲沙孔破裂的原因。The sand flushing sluice of a hydropower station ruptured and collapsed during construction.ANSYS is used to establish a three-dimensional finite element model of the sand flushing sluice section,and the check calculation and analysis of the sand flushing sluice structure are carried out.The reinforcement of the structure is calculated based on the stress diagram,and compared with the actual reinforcement to analyze the cause of the rupture of the flushing sluice.
分 类 号:TV673.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38