几内亚苏阿皮蒂大坝碾压混凝土入仓方式的研究与运用  被引量:5

Research and Application of Roller Compacted Concrete Placing Method in Souapiti Dam of Guinea

在线阅读下载全文

作  者:王以斌 寿开 刘玉琴 李全旭 WANG Yibin;SHOU Kai;LIU Yuqin;LI Quanxu(China International Water&Electric Corp.,Beijing 100120,China)

机构地区:[1]中国水利电力对外有限公司,北京100120

出  处:《水力发电》2020年第1期81-85,共5页Water Power

摘  要:几内亚苏阿皮蒂水利枢纽工程碾压混凝土重力坝混凝土浇筑总量约360万m 3,合同工期58个月,其中混凝土浇筑高峰期在2018年~2019年,混凝土月高峰强度超过20万m 3。介绍了苏阿皮蒂大坝碾压混凝土的入仓方式,合理的混凝土入仓方案保证了工程的顺利建设,为水电站在2020年按期发电和完工奠定了良好的基础。The total amount of concrete for the RCC gravity dam of Souapiti Hydro Project is about 3.6 million m 3.The contracted concrete pouring period is 58 months,in which,the peak period of concrete pouring is between 2018 and 2019 with a peak intensity of more than 200 thousand m 3.The concrete placing method for the RCC dam of Souapiti Hydro Project is introduced.The reasonable concrete placing scheme ensures the smooth construction of project and lays a good foundation for the hydropower station to generate electricity and complete on schedule in 2020.

关 键 词:碾压混凝土 入仓道路 苏阿皮蒂水利枢纽 几内亚 

分 类 号:TV544.921[水利工程—水利水电工程] TV633(451)

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象