检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴先朝
机构地区:[1]中国电信南平分公司运营支撑中心
出 处:《中国新通信》2019年第23期86-89,共4页China New Telecommunications
摘 要:本文通过利用新建的高铁(高速)光缆,对现网受外部环境影响较深的干线传输系统通过对整个光复用段的光缆长度、色散补偿及光功率进行深度的分析,并对单波40G的色散补偿辅以三维仿真技术进行计算,进行相关色散补偿的增减,系统路由调整后,系统的各项指标正常。本文以局站1-局站2-局站3段落干线光缆的典型场景提供解决案例,进一步探讨如何及时结合新建的光缆网络资源优化现网干线传输系统,为提升干线传输网络健壮性提供解决思路和借鉴。In this paper, by using the new high-speed optical cable, the trunk transmission system which is deeply affected by the external environment of the existing network, through the depth analysis of the optical cable length, dispersion compensation and optical power of the whole optical reuse section, and the dispersion compensation of single wave 40 G is calculated by threedimensional simulation technology, and the correlation dispersion compensation is increased or decreased. After the routing adjustment of the system, the indexes of the system are normal. This paper provides a typical case of 3-stage trunk optical cable from station 1 to station 2 to station 3, and further discusses how to optimize the trunk transmission system in time combined with the newly built optical cable network resources. the purpose of this paper is to provide solutions and reference for improving the robustness of trunk transmission network.
分 类 号:U285[交通运输工程—交通信息工程及控制] TN818[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7