检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程敏[1] 刘亚群 王洪强[1] CHENG Min;LIU Ya-qun;WANG Hong-qiang(School of Management,Shanghai University,Shanghai 200444,China)
机构地区:[1]上海大学管理学院
出 处:《运筹与管理》2019年第10期40-49,共10页Operations Research and Management Science
基 金:上海市哲学社会科学规划项目(2016BGL008)
摘 要:为了解邻避设施PPP项目中公共部门、私人部门和公众的行为选择及其影响因素,将演化博弈方法与系统动力学方法相结合开展研究。首先,在三方具有有限理性的前提下,构建三方演化博弈模型,对三方主体的互动行为及稳定状态进行分析;然后,在此基础上采用系统动力学方法对三方演化博弈过程进行动态模拟仿真,研究各种不确定性因素对博弈演化过程的影响,为制定相关政策提供依据;最后,根据仿真结果提出对策建议。仿真结果表明,三方主体的策略选择由多个外部变量因素共同作用,通过改变仿真系统中的外部变量取值,系统最终能达到(政府积极监管、企业积极努力、公众参与监督)的均衡状态;在三方博弈过程中,政府起引导作用,公众的监督作用不容忽视,合理的惩罚方案有助于减少企业机会主义行为。因此,可从构建多主体协调机制、重视公众参与监督、构建社会监督保障体系、设计合理的激励方案等方面促进邻避设施PPP项目顺利开展。In order to understand the factors that influence the behavior options of the government, the enterprise, and the public in PPP projects of not-in-my-backyard(NIMBY)facility, the evolutionary game method and the system dynamics method are combined to carry out the study. Firstly, an evolutionary game model is constructed based on the assumption that the three parties have bounded rationality, and the interaction mechanism and the stability of the three parties are analyzed. Then, the system dynamics method is used to simulate the three-party evolution game process, and the influence of various uncertain factors on the game evolution process is studied, which provides a basis for formulating relevant policies. Finally, countermeasures are proposed based on the simulation results. The simulation results show that the strategic choice of the three parties is influenced jointly by some external variables. When changing the value of the external variables in the simulation system, the game will eventually reach the equilibrium state in which the government supervises positively, the enterprise makes positive efforts and the public participates in supervision. It is also shown that the government is the dominant player in the process of tripartite game and the public supervision is important in PPP projects of NIMBY facility. Meanwhile, a reasonable project punishment scheme is helpful for reducing the opportunistic behavior of the enterprise. Therefore, it is possible to promote the smooth progress of the PPP project of the NIMBY facility from the aspects of constructing a multi-agent coordination mechanism, attaching importance to public supervision, constructing a social supervision system, and designing a reasonable incentive plan.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117