检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:寿焕均 SHOU Huanjun(Shanghai Construction No.4(Group)Co.,Ltd.,Shanghai 201103,China)
机构地区:[1]上海建工四建集团有限公司
出 处:《建筑施工》2019年第12期2154-2156,共3页Building Construction
摘 要:以某渗滤液处理厂大型水池为例,针对其满水试验中出现的渗漏水情况,从施工缝、止水螺栓、穿墙套管、后浇带和自防水混凝土性能等方面,分析了渗漏产生的原因,并提出了相应的防治措施。同时,通过采取在背水面压力注浆止水的施工技术,达到了预期的堵漏效果,满足了水池使用功能的要求。Taking a large-scale pool of a leachate treatment plant as an example, aiming at the leakage situation in its full-water test, the causes of leakage are analyzed from the aspects of construction joints, waterproof bolts, wall bushing, post-pouring belt and the performance of self-waterproof concrete, and the corresponding preventive measures are put forward. At the same time, through the construction technology of pressure grouting at the back water surface, the anticipated leakage-proof effect is achieved, and the requirements of the service function of the pool are met.
分 类 号:TU761.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222