某82000DWT散货船建造技术优化  

Optimization of Construction Technology for 82000DWT Bulk Carrier

在线阅读下载全文

作  者:袁辉 YUAN Hui(Hudong-Zhonghua Shipbuilding(Group)Co.,Ltd.,Shanghai 201913)

机构地区:[1]沪东中华造船(集团)有限公司

出  处:《广东造船》2019年第6期58-60,77,共4页Guangdong shipbuilding

摘  要:本文以某型82000DWT散货船分段划分为基础,结合实际情况,分别对双层底、舷侧、首部、舵机舱及尾部、上建等5个预总段及总段进行设计优化。依据优化后的预总段及总段划分方法,可有效提高舱室结构及舾装完整性,减少压载舱区域涂层因后续施工引起的破坏,同时缩短总段总组及搭载周期。Based on the block division of an 82000DWT bulk carrier,combined with the actual situation,the design optimization of the prefabricated blocks and blocks including double bottom,side,bow,steering engine room,stern and superstructure are carried out respectively.According to the optimized prefabricated block and block division method,the integrity of cabin structure and outfitting can be effectively improved,the damage of the coating in the ballast tank area caused by the subsequent construction can be reduced,and the cycle of block assembly and erection can be shortened.

关 键 词:PSPC 舾装完整性 周期 

分 类 号:U671.4[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象