检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘子扬 Liu Ziyang(CRSC Research&Design Institute Group Co.,Ltd,Beijing 100070,China)
出 处:《铁路通信信号工程技术》2020年第1期45-49,共5页Railway Signalling & Communication Engineering
基 金:国家重点研发计划资助(2017YFB1200700)
摘 要:为实现中间站平面调车方式由人工手动编制向自动化、智能化转变,对计算机自动编制中间站钩计划进行研究,通过将人工编制计划过程抽象为计算机能够自动推演的规则,可以实现连续自行输出钩计划执行方案。通过将规则划分为通用和专用,可以提高编制计划的泛化性,同时通过将多台调机同时作业场景转换为单机作业场景,有效降低自动编制的复杂度。The paper proposes a new method for railway intermediate station shunting plan generation based on computer, which will lead transformation from manual programming to automation and intellectualization. The continuous automatic output of shunting plans can be realized by abstracting from manual programming process the rules that the computer can deduce automatically. The generalization of planning can be improved by dividing the rules into general and special ones. And the complexity of automatic programming can be effectively reduced by transforming simultaneous operation scenarios of multiple dispatchers into single operation scenarios.
分 类 号:U292.4[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.167.222