吕家坨矿洗煤厂老主井卸煤系统改造分析  被引量:2

Analysis of Coal Unloading System Reform in Old Main Shaft of Lvjiatuo Coal Washing Plant

在线阅读下载全文

作  者:赵文浩 Zhao Wenhao(Lvjiatuo Coal Washing Plant of Coal Washing and Processing Center,Kaili Energy&Chemical Co.,Ltd.,Tangshan 063107,China)

机构地区:[1]开滦能源化工股份有限公司煤炭洗选加工中心吕家坨洗煤厂

出  处:《中国资源综合利用》2020年第1期100-102,共3页China Resources Comprehensive Utilization

摘  要:近年来,由于吕家坨矿井煤层、煤质及回采工艺的改变,堵仓、水煤及次生事故已成为老主井卸煤环节的典型问题。本文通过系统分析和方案论证,实施了储煤仓结构优化、给煤设备升级及附属设施完善等技术改造。此次改造有效地提升了老主井卸煤系统的稳定性和生产效率。In recent years,due to the change of coal seam,coal quality and stoping technology in Lvjiatuo mine,blockages,water-coal and secondary accidents have become the typical problems of coal unloading in the old main shaft.Through system analysis and program demonstration,the paper carried out the optimization of coal storage structure,upgrading of coal equipment and improvement of ancillary facilities.The modification effectively improves the stability and production efficiency of the coal unloading system in the main shaft.

关 键 词:卸载系统 问题分析 改造方案 

分 类 号:TD534[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象