检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李福固 姬冬 Li Fu-gu;Ji Dong(Shandong Yankuang Technical College,Shandong Zoucheng 273500;Xinglongzhuang Coal Mine,Yankuang Group,Shandong Yanzhou 272102)
机构地区:[1]山东兖矿技师学院,山东邹城273500 [2]兖矿集团兴隆庄煤矿,山东兖州272102
出 处:《山东煤炭科技》2020年第1期110-111,共2页Shandong Coal Science and Technology
摘 要:更换煤矿主提升机平衡尾绳是煤矿重大检修项目之一,原施工方案为两条平衡尾绳同时更换,存在较多不合理之处,改进为以新绳带旧绳、单绳依次更换的方案,实现了安全、快捷地更换平衡尾绳,同时减少施工对矿井生产的影响,提高煤矿经济效益。Replacing the balance tail rope of a main hoist is one of the major maintenance projects in a coal mine.The previous scheme is to replace two balance tail ropes at the same time,which is unreasonable.The new scheme is to substitute the old rope for a new one and replace the single rope in turn,which realizes the safe and quick replacement of the balance tail ropes,and at the same time reduces the impact of construction on mine production and improves the economic benefits of the coal mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229