某电厂350MW发电机进相实验调试实践  

Commissioning of Phase Advance Experiment of 350MW Generator in a Power Plant

在线阅读下载全文

作  者:周新华 蔡兆顺 Zhou Xinhua;Cai Zhaoshun(Energy Center of Jiuquan Iron and Steel(Group)Corporation,Jiayuguan,Gansu,735100)

机构地区:[1]酒钢集团能源中心

出  处:《酒钢科技》2019年第4期66-70,共5页

摘  要:对某电厂350MW发电机调试阶段进相运行过程进行研究,分析不同负荷下发电机组进相运行影响因素及进相深度,得出在实验电网条件下不同负荷350MW机组发电机进相运行深度,为今后发电机组特殊条件运行提供依据,同时也为电网电压调节提供新的手段,对同类型机组的进相实验提供借鉴。The phase advance operation process of 35OMW generator in a power plant during commissioning stage is studied.The influencing factors and phase advance depth of generator with different loads are analyzed.The phase advance operation depth of 350MW generator with different loads under experimental grid conditions is obtained,which provides a basis for the special operation of generator units in the future.At the same time,it also provides a new method for grid voltage regulation,and provides a reference for the phase advance experiments of similar units.

关 键 词:进相运行 调压 励磁电流 功角 

分 类 号:TM6[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象