大型低扬程泵站的停机过渡过程研究  被引量:7

Study on shutdown transition process of large low head pumping station

在线阅读下载全文

作  者:杨林 许哲 郑源[2] YANG Lin;XU Zhe;ZHENG Yuan(Anhui Chizhou Guichi District Water Conservancy Planning and Design Office,Guichi 247000,China;School of Water Resources and Hydropower,Hohai University,Nanjing 210098,China)

机构地区:[1]安徽省池州市贵池区水利规划设计室,安徽贵池247000 [2]河海大学水利水电学院,江苏南京210098

出  处:《水利建设与管理》2020年第2期73-79,共7页Water Conservancy Construction and Management

摘  要:本文针对大型立式轴流泵停机过渡过程中可能出现的不安全因素,对具有直管式出水流道的大型立式轴流泵进行建模,采用VOF技术计算模拟,使用UDF功能模拟快速闸门关闭过程,并对现场导叶处压力脉动进行同步动态测量,以验证数值分析结果的准确性。结果表明:轴流泵机组在停机过程中会依次进入水泵工况、制动工况、水轮机工况;在快速闸门关闭后,叶片力矩与叶片轴向力会发生明显振荡,易诱发抬机事故。研究结果对泵站安全生产具有指导意义。The large vertical axial flow pump with straight pipe outlet conduit is modeled in view of possible unsafe factors in the stop transition process of large vertical axial flow pumps. Simulation is obtained by using the VOF technique, UDF function is applied to simulate the closing process of fast gate, the pressure pulsation of the guide vane undergoes synchronous dynamic measurement, thereby verifying the accuracy of the results of numerical analysis. The results show that the axial flow pump unit in the shutdown process will successively enter the pump operating conditions, braking conditions and turbine operating conditions;After the rapid gate is closed, the blade torque and the blade axial force will shock obviously, and it is easy to induce the lifter accident. The results are of guiding significance to the safe production of pumping station.

关 键 词:轴流泵 停机工况 过渡过程 真机试验 

分 类 号:TV734[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象