检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫东东 YAN Dongdong(Shanxi Xishan Coal and Power Co.,Ltd..Xiqu Mine,ShanxiGujiao030200)
机构地区:[1]山西西山煤电股份有限公司西曲矿
出 处:《煤矿现代化》2020年第2期24-26,共3页Coal Mine Modernization
摘 要:本文依托西曲矿生产实际,采用现场调研的方法,对28301工作面生产条件以及地表破坏状态进行了统计分析,结合理论计算的方法,对浅埋复采地貌下空区下采场顶板结构进行了初步分析,并结合“普氏矿压”理论,提出了工作面液压支架顶梁上方的“应力卸荷拱”理论。据此计算工作面液压支架工作阻力,在西曲矿28301工作面成功运用。Based on the production practice of Xiqu Mine and the method of field investigation,this paper makes statistical analysis on the production conditions and surface damage state of 28301 working face.Combined with the method of theoretical calculation,this paper makes a preliminary analysis on the roof structure of the stope below the goaf under the Shallow-buried duplicate mining landform.Combining with the theory of"Pu's rock pressure",the paper puts forward the"stress relief arch"above the roof beam of hydraulic support in working face.Theory.Based on this,the working resistance of hydraulic support in working face is calculated and successfully applied in 28301 working face of Xiqu Coal Mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15