检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚元玺[1] 张丽娟[1] YAO Yuanxi;ZHANG Lijuan(Shandong Electirc Power Engineering Consulting Institute Co.,Ltd.,Jinan 250013,China)
机构地区:[1]山东电力工程咨询院有限公司
出 处:《山东电力技术》2020年第1期24-28,共5页Shandong Electric Power
摘 要:鲁固特高压直流工程黄河跨越段跨距长,杆塔高度高,承载负荷大,设计难度大,跨越塔设计是工程设计的关键环节。通过多种方案对比、经济性比较,采取了系列结构优化措施,跨越塔采用了外型美观、结构布置紧凑的展翅型塔头方案,选用Q420钢管塔结构,风振系数计算方法安全可靠、节点设计合理、施工及检修设施适应性强,可为后续工程黄河大跨越铁塔设计提供参考。For the long span transmission line project of Lugu UHVDC crossing the Yellow River,the span is large,the tower height is high,external load is large,the design difficulty is large,so the design of crossing tower is the key link of engineering design.Through various schemes comparison and economic comparison,a series of structural optimization measures have been adopted,and the scheme of wing-spreading tower head with beautiful appearance and compact layout is adopted,and the Q420 steel pipe is selected for the crossing tower,the calculation method of wind vibration coefficient is safe and reliable,node design is reasonable,construction and maintenance facilities are adaptable.The above can provide design reference for the follow-up design of the large-span crossing tower.
关 键 词:跨越塔 钢管 Q420高强钢 风振系数 刚性法兰 斜爬梯
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.186