清河水库右岸泄洪洞衬砌施工技术研究  被引量:1

Study on lining construction technology for right bank spillway tunnel of the Qinghe Reservoir

在线阅读下载全文

作  者:张传传 ZHANG Chuanchuan(Qinghe Reservoir Administration Bureau Co.,Ltd.,Tieling 112003,China)

机构地区:[1]辽宁省清河水库管理局有限责任公司

出  处:《水科学与工程技术》2020年第1期57-59,共3页Water Sciences and Engineering Technology

摘  要:以清河水库除险加固工程中右岸泄洪洞新建隧洞为例,结合拉模与定型模板施工工艺特点,分析了两者在隧洞衬砌施工中设计及综合运用。实践证明:在隧洞衬砌施工中采用拉模与定型钢模板综合施工方案,既保证了衬砌混凝土质量,又节约了工期及异型模板的制作费用,促进了在实际工程中的应用。Taking the new tunnel in the right bank spillway tunnel of the Qinghe Reservoir Reinforcement Project as an example,and combining the construction technology characteristics of drawing formwork and set-shaped formwork,this paper studies the design and comprehensive application of the two methods in tunnel lining construction.The practice has proved that the comprehensive construction scheme of drawing die and set-shaped steel formwork is adopted in tunnel lining construction.The lining scheme not only guarantees the quality of concrete,but also saves the construction period and the cost of making special-shaped formwork,and promotes the application in practical engineering.

关 键 词:泄洪洞 拉模 定型模板 衬砌 

分 类 号:TV622[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象