浅谈变电站老旧二次设备的改造方案及改进  被引量:2

Discussion on Renovation Scheme of Old and Deteriorating Secondary Equipment in Substation and Its Improvement

在线阅读下载全文

作  者:姚亮[1,2] 凌岩 孙晓龙 Yao Liang;Ling Yan;Sun Xiaolong(Guodian Nanjing Automation Co.,Ltd.,Nanjing 211153,Jiangsu,China;Nanjing SAC Automation Co.,Ltd.,Nanjing 211153,China)

机构地区:[1]国电南京自动化股份有限公司,江苏南京211153 [2]南京国电南自电网自动化有限公司,江苏南京211153

出  处:《四川电力技术》2020年第1期72-76,共5页Sichuan Electric Power Technology

摘  要:归纳目前变电站二次设备改造方案,分析不同方案下常见设备的改造,综合现场施工和改造设备的特点,推荐“原屏改造”与“整屏更换”相结合,提出了预制电缆的“原屏改造”和拼接机柜的“整屏更换”的改进措施,采用自动对点系统改进系统接入工作,提高了改造效率,缩短了停电时间。The current renovation schemes of secondary equipment in substations are summarized,and the renovation of different schemes for common equipment is analyzed.Based on the characteristics of substation field construction and renovation equipment,the integrated scheme of"renovation-in-original-cabinet"and"whole-cabinet-replacement"is recommended,the improvement measures of"renovation-in-original-cabinet"for the prefabricated cables and"whole-cabinet-replacement"for splicing cabinets are put forward,and automatic information checking system is adopted to improve system access.These methods could improve the renovation efficiency and shorten the power cuts.

关 键 词:老旧 二次设备 常规改造 原屏改造 整屏更换 

分 类 号:TM774[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象