检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王德俊 WANG Dejun(Zhurrtadian Lutong Engineering Supervision Consulting Co.,Ltd.,Zhumadian Henan 463000,China)
机构地区:[1]驻马店路通工程监理咨询有限公司
出 处:《自动化与仪器仪表》2020年第1期200-203,共4页Automation & Instrumentation
基 金:国家电网公司科技项目(No.PD72-17-006)
摘 要:为了提高遂道洞口施工弹塑性数值自动监测能力,提出基于结构参数和荷载识别的遂道洞口施工弹塑性数值自动监测方法。构建遂道洞口施工弹塑性数值监测模型,采用线性和非线性结构的参数联合辨识方法进行遂道洞口施工弹塑性应力参数测试,提取遂道洞口的损伤参数和力矩参数,分析遂道洞口的荷载-变形模式,计算遂道洞口施工弹塑性数值的薄膜效应阶段荷载-位移特征量,采用结构参数和荷载识别方法进行遂道洞口施工弹塑性数值自动监测。仿真结果表明,采用该方法进行遂道洞口施工弹塑性数值自动监测的准确性较高,实时监测能力较好,提高了遂道洞口施工弹塑性数值分析能力。In order to improve the elastic-plastic numerical automatic monitoring ability of tunnel entrance construction,an elastic-plastic numerical automatic monitoring method based on structural parameters and load identification is proposed.The elastic-plastic numerical monitoring model of tunnel entrance construction is constructed,and the elastic-plastic stress parameters of tunnel entrance construction are tested by using the joint identification method of linear and nonlinear structure parameters,and the damage parameters and moment parameters of tunnel entrance are extracted.The load-deformation mode of the tunnel entrance is analyzed,and the load-displacement characteristic quantity of the elastic-plastic effect stage of the tunnel entrance construction is calculated.The structural parameters and load identification method are used to automatically monitor the elastic-plastic numerical value of the tunnel entrance construction.The simulation results show that the accuracy of elastic-plastic numerical automatic monitoring of tunnel entrance construction is high,the real-time monitoring ability is better,and the elastic-plastic numerical analysis ability of tunnel entrance construction is improved.
分 类 号:TP29[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33