检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:涂小飞 邬旺 TU Xiaofei;WU Wang(Chengdu Engineering Corporation Limited,Chengdu 610072,China;CCCC Fourth Harbor Engineering Co.Ltd,Guangzhou 510290,China)
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川省成都市610072 [2]中交第四航务工程局有限公司,广东省广州市510290
出 处:《水电与抽水蓄能》2019年第6期78-82,74,共6页Hydropower and Pumped Storage
摘 要:水力学模型试验能够验证水力学计算成果的准确性,为优化设计提供科学依据,是大中型水电工程施工导流设计过程中的重要参考依据。为避免导流洞出口水流对下游的冲刷,对导流洞出口消能措施进行了研究。本文通过物理模型试验的前后对比,得到导流洞出口体型优化建议方案。Hydraulic model test is an important referenee for designing large and medium-sized hydropower projects,which can be used to verify the accuracy of hydraulic calculation results and provide scientific basis for optimizing the design.In this paper,energy dissipation measures to avoid the scouring at the diversion tunnel outlet have been studied.The optimization scheme of the diversion tunnel outlet is obtained by the hydraulic model test.
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48