检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁倩 LIANG Qian(Hunan Technical College of Water Resources and Hydropower,Changsha 410131,China)
机构地区:[1]湖南水利水电职业技术学院
出 处:《水电与抽水蓄能》2019年第6期124-127,共4页Hydropower and Pumped Storage
摘 要:在水工隧洞衬砌配筋计算分析中,通过DL/T 5195—2004《水工隧洞设计规范》配筋计算公式计算,在部分情况下钢筋配筋量为负值,与实际不相符,本文通过改进规范配筋公式,提出一种内力叠加公式法,并把其配筋结果与有限元法和边值法进行对比验证,三种方法结果拟合度很高,证明了内力叠加公式法的可行性。In hydraulic tunnel lining reinforcement calculation analysis,through the DL/T 5195—2004《specification for design of hydraulic tunnel》reinforcement calculation formula,some cases steel reinforcement amount is negative,and inconsistent with actual.This paper proposes a method of internal force superposition formula,and its reinforcement result compared with finite element method and boundary value method validation,the fit of the three methods result is very high,prove the feasibility of internal force super position formula method.
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63