检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵歆 罗彬[1] ZHAO Xin;LUO Bin(Chongqing Luohuang Power Generation Co.,Ltd.of CHNG,Chongqing 402283,P.R.China)
机构地区:[1]华能重庆珞璜发电有限责任公司
出 处:《重庆电力高等专科学校学报》2019年第6期5-7,共3页Journal of Chongqing Electric Power College
摘 要:针对厂用6 kV中压经小电阻接地系统,通过分析接地故障电流,以及接线方式不同时电路原理,指出串联接线的错误接线方式及其造成的后果。同时提出当同一负荷采用多根动力电缆并联接线,且采用多个零序电流互感器穿过不同的一次动力电缆来实现零序接地保护时应注意的要点。Based on the 6kV medium-voltage low-resistance earthing system,by analyzing the current of the earthing faults as well as circuit theories in correspondence with different modes of wiring,this paper points out wrong ways of series wiring and relevant consequences.In addition,it puts forward points for attention when several power cables are used for parallel wiring for one load and when the zero sequence ground protection is realized by passing several zero sequence current mutual inductors through different primary power cables.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.83.123