检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李平 Li Ping
机构地区:[1]重庆中泰工程咨询有限公司
出 处:《吉林水利》2020年第1期25-28,共4页Jilin Water Resources
摘 要:底流消能是一种应用广泛并且工程实践优良的消能工形式,池长是决定其消能表现的一项决定性因素。本文针对两种池长的消力池进行了研究,对水流流态、时均压强、脉动压强以及消能效率等水力特性进行了测量和对比分析。结果表明:加长消力池有助于降低池内各项水力学指标,同时还能改善出池水流与下游河道水流的衔接状态,且池长的增大对消力池的总消能效率影响也相对较小。Energy dissipation by hydraulic jump is a kind of energy dissipation works which is widely used,and is well known in water project construction practice.Length of spillway basin is a decisive factor which effects on hydraulic characteristics of flow in the basin.In this paper,the author studied spillway basin with two lengths,and measured and compared their hydraulic characteristics,including flow state,time averaged pressure,pulsating pressure,energy dissipation rate,and so on.The result shows that lengthening spillway basin is helpful to reducing every hydraulic index in the basin,also improving the joining state between the flow out of basin and the flow in downstream river,and the increase of the length is relatively small in effecting on total energy dissipation rate of the basin.
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7