大藤峡水利枢纽泄洪消能布置演变与闸门调度  被引量:1

Evolution of flood discharge and energy dissipation and gate regulation of Datengxia Hydraulic Project

在线阅读下载全文

作  者:巩宪春[1] 王常义[1] 范宝山[1] 李广一[1] Gong Xianchun;Wang Changyi;Fan Baoshan;Li Guangyi

机构地区:[1]中水东北勘测设计研究有限责任公司

出  处:《中国水利》2020年第4期76-79,共4页China Water Resources

摘  要:大藤峡水利枢纽泄水建筑物具有库水位变幅大、单宽流量大、尾水变幅大等水流特性和闸下水流拍打钢梁、推移质过坝的运行特点,消能形式选择限制因素多,消能问题非常复杂。对大藤峡水利枢纽二级逆坡分区消力池布置演变过程进行阐述,给出枢纽典型工况泄洪消能调度与闸门调度原则,可供类似工程参考。The discharge structures of the Datengxia Reservoir have water flow features of wide variation of water level,big flow of reservoir width and big changes of tail water,as well as operating characters of flow downstream from shiplock patting steel beam and bedload passing though the dam.Energy dissipation becomes more complicated due to the restriction factors for the selection of energy dissipation methodologies.Based on examination of evolution of stilling pool arrangement of the secondary reverse slope zoning of the Datengxia Dam,principles are defined for standard conditions to regulate flood discharge or energy dissipation and sluices gates,which can provide a reference to the other similar projects.

关 键 词:大藤峡水利枢纽 泄洪消能 辅助消能工 二级消力池 

分 类 号:TV65[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象