检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余继民 YU Ji-min(China Railway Twelfth Bureau Group Fourth Engineering Co.Ltd.,Xi'an 710021,China)
机构地区:[1]中铁十二局集团第四工程有限公司
出 处:《工程建设与设计》2020年第3期189-191,共3页Construction & Design for Engineering
摘 要:随着中国铁路事业高速发展,铁路干线的普速道岔已无法满足运输能力的需求。于是,普速铁路需进行提速改造和高速铁路对接,在改造的过渡期,高速道岔的插入是整个既有线提速改造的重中之重,因此,论文阐述了韩原铁路正线(160 km/h无缝线路)上插入高速道岔施工过程中的经验,以供同类工程借鉴。With the rapid development of China’s railway industry, the common speed turnout of the main railway line has been unable to meet the demand of transportation capacity. Therefore, the ordinary speed railway needs to be upgraded and connected with the high-speed railway. In the transition period of the renovation, the insertion of high-speed turnout is the most important part of the whole existing railway. Therefore, the paper expounds the experience in the construction process of inserting high-speed turnout on the main line(160 km/h jointless track) of Hanyuan railway for reference of similar projects.
分 类 号:U213.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49