补连塔煤矿新副斜井工业场地总图规划设计  

The general layout design of the new auxiliary inclined shaft industrial site in Bulianta coal mine

在线阅读下载全文

作  者:任永强 Ren Yongqiang(Ordos Shendong Engineering Design Co.,Ltd.,Ordos 017000,China)

机构地区:[1]鄂尔多斯市神东工程设计有限公司

出  处:《山西建筑》2020年第5期14-16,共3页Shanxi Architecture

摘  要:矿井工业场地总图设计是利用自然地形,结合井下开拓布置及外部建设条件,合理选择场址以减少压煤。做到功能分区明确,建筑物布局紧凑,雨水排放顺畅,人货分物,流线通畅。在满足生产需求、工艺流程及场地安全的前提下,优化总平面及竖向设计。力求降低土石方量开挖及场地防护工程量,科学用地,节约投资。The general layout design of mine industrial site is based on natural terrain,combined with underground exploitation and external construction conditions. Reasonable site selection to reduce coal compaction. Achieve clear functional partition,compact building layout,smooth rainwater drainage,people and goods,streamline unobstructed. On the premise of satisfying the production demand,technological process and site safety,the general plane and vertical design are optimized through multiple schemes.To reduce the volume of excavation and site protection engineering,scientific use of land,save investment.

关 键 词:补连塔煤矿 矿井工业场地 总平面布置 竖向设计 防洪排涝 

分 类 号:TD713[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象