检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康志国 Kang Zhiguo(Shanxi Xishan Jin Xing Energy Co.,Ltd.,Shanxi Taiyuan 030053)
机构地区:[1]山西西山晋兴能源有限责任公司机电部,山西太原030053
出 处:《同煤科技》2020年第1期26-29,共4页Datong Coal Science & Technology
摘 要:通过对斜沟矿区开采多年来10 kV供电系统电容电流的增长情况研究,分析了导致斜沟矿区10kV系统单相接地电容电流过大原因,并根据斜沟矿区生产供电现状,采取了定制安装最大补偿能力为200 A的大容量成套消弧装置对10 kV系统单相接地电容电流进行补偿灭弧,并满足矿井未来采掘延伸后电容电流的增长需求,同时制定矿区电缆使用规定措施来进一步抑制矿区电容电流的增长。Through the research on the increase of the capacitance current of 10kV power supply system in the mining of Xiegou mining area for many years,this paper analyzes the causes of the excessive single-phase grounding capacitance current of the 10kV system in Xiegou mining area,and according to the current situation of production and power supply in the Xiegou mining area,a large-capacity complete arc-extinguishing device with a maximum compensation capacity of 200A is used to compensate and extinguish the single-phase grounding capacitor current of the 10kV system,which meets the requirements in the future,the demand for the increase of the capacitance current after the extension of mining will be increased.At the same time,the regulation measures for the use of cables in the mining area will be formulated to further restrain the increase of the capacitance current in the mining area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.196.112