检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:桑丙玉[1] 姚良忠[1] 李明杨 艾小猛[2] 周博 文劲宇[2] SANG Bingyu;YAO Liangzhong;LI Mingyang;AI Xiaomeng;ZHOU Bo;WEN Jinyu(China Electric Power Research Institute,Nanjing 210003,China;State Key Laboratory of Advanced Electromagnetic Engineering and Technology(School of Electrical and Electronic Engineering,Huazhong University of Science and Technology),Wuhan 430074,China)
机构地区:[1]中国电力科学研究院,江苏南京210003 [2]强电磁工程与新技术国家重点实验室(华中科技大学电气与电子工程学院),湖北武汉430074
出 处:《电力系统保护与控制》2020年第5期86-94,共9页Power System Protection and Control
基 金:国家电网公司科技项目资助(NYN17201600314)~~
摘 要:随着风电规模的快速增长,其消纳问题日益突出,直流电网结合储能技术能为风电大规模消纳提供一定技术支撑。以典型日下储能日化投资、火电机组运行成本与弃风惩罚成本之和最小为目标,提出了一种直流电网储能容量规划模型。模型综合考虑了火电机组、电池储能、抽蓄机组的协调运行,为非凸非线性模型,无法通过求解器直接求解。采用分段线性化、大M法及锥松弛等手段将模型转化为等效的二阶锥规划模型,可调用CPLEX求解器获得模型的全局最优解。最后,以风电汇集的多端直流系统为例进行仿真验证,结果表明配置的储能可提高系统风电消纳能力,降低系统运行成本,验证了所提模型的有效性。With the rapid growth of wind power scale,the problem of wind power consumption is becoming increasingly prominent,and the combination of DC grid and energy storage technology can provide certain technical support for large-scale wind power consumption.In order to minimize the sum of typical daily energy storage investment,thermal power unit operation cost and wind abandonment penalty cost,this paper proposes a DC power grid energy storage capacity planning model.The model considers the coordinated operation of thermal power units,battery energy storage units and pumped storage units.It is a non-convex nonlinear model,which can not be solved directly by the solver.In this paper,by means of piecewise linearization,large M method and cone relaxation,the model is transformed into an equivalent second-order cone programming model.Finally,the simulation results of the multi terminal DC system with wind power integration show that the energy storage can improve the wind power consumption capacity of the system and reduce the operating cost of the system,verifying the effectiveness of the proposed model.
分 类 号:TM614[电气工程—电力系统及自动化] TM721.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28