检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:庞贵艮 PANG Guigen(Baode Coal Mine,Shenhua Shendong Coal Group Co.,Ltd.,Baode 036600,China)
机构地区:[1]神华神东煤炭集团保德煤矿
出 处:《煤矿安全》2020年第1期75-79,共5页Safety in Coal Mines
摘 要:保德煤矿属带压开采矿井,煤层底板承受最大水压达到5.3 MPa。为了保证矿井安全带压开采,通过对矿井奥灰含水层特征、突水机理及防治技术进行研究,针对矿井不同水平煤层带压开采所面临的水文地质条件和突水危险性,采用采掘前隐伏导水构造的综合探查与评价和奥陶系峰峰组隔水性能利用2种奥灰水害防治方法,有效保障了矿井近10年的安全带压开采,杜绝了奥灰水害的发生;由此得出隐伏导水构造探查和奥陶系峰峰组利用作为矿井奥灰水害防治关键技术是科学、有效的。Baode Coal Mine is a coal mine mining under pressure, and the maximum water pressure of coal seam floor is 5.3 MPa. In order to ensure safe mining under pressure, the characteristics of Ordovician limestone aquifer, water inrush mechanism and prevention technology are studied. In view of the hydro-geological conditions and water inrush risks of coal seam mining at different levels under pressure, the comprehensive exploration and evaluation of the concealed water conducting structure before mining and the water resistance of Ordovician Fengfeng Formation are used to prevent and control Ordovician lime water hazard,which effectively guarantees the safe mining under pressure for nearly ten years and prevents the occurrence of Ordovician lime water hazard. It is considered that the exploration of concealed water conducting structure and the utilization of Ordovician Fengfeng Formation as the key technology for Ordovician lime water hazard prevention and control are scientific and effective.
分 类 号:TD745.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15