检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王晓波 赵子豪 Wang Xiaobo;Zhao Zihao(The First Construction Engineering Co.,Ltd.of CSCEC Xinjiang Construction&Engineering(Group)Co.,Ltd.,Urumqi Xinjiang Autonomous Region 830011,China)
机构地区:[1]中建新疆建工集团第一建筑工程有限公司,新疆乌鲁木齐830011
出 处:《城市建筑》2019年第35期127-128,共2页Urbanism and Architecture
摘 要:为尽可能地压缩地下综合管廊桥架生产加工时间,缩短桥架安装工期,节约施工成本,项目创新桥架小空间后成孔施工技术,解决了因分支桥架(软管)位置不易控制,从而导致供货周期延长和桥架安装时间延长的问题。In order to compress the production and processing time of the underground comprehensive pipe gallery bridge as far as possible, shorten the installation period of the bridge and save construction cost, the project innovates the post hole construction technology of the bridge with small space, and solves the problem of extending the supply cycle and the installation time of the bridge due to the difficulty in controlling the position of the branch bridge(hose).
分 类 号:TM75[电气工程—电力系统及自动化] U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28