检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:倪文斌 夏宇峰 陆游 张云龙 李婷 Ni Wenbin;Xia Yufeng;Lu You;Zhang Yunlong;Li Ting(Hubei Electric Engineering Corporation Limited,Wuhan 430040,China)
机构地区:[1]湖北省电力勘测设计院有限公司
出 处:《能源与环保》2020年第2期85-90,94,共7页CHINA ENERGY AND ENVIRONMENTAL PROTECTION
摘 要:为提高园区多能互补工程的能源综合利用效率及整体效益,对供能系统设计中的负荷统计、逐时负荷匹配、供能系统、设备选型、容量配置及运行策略等问题进行了分析和总结,提出园区多能互补供能系统设计的基本流程与方法,可为园区多能互补供能系统的设计提供参考。In order to improve the energy comprehensive utilization efficiency and overall benefit of the multi-energy complementary project in park,the load statistics,hourly load matching,energy supply system,equipment selection,capacity allocation and operation strategy in the design of energy supply system were analyzed and summarized,and the basic process and method of the design of the park multi-energy complementary energy supply system were put forward,which can provide reference for the design of the multi-energy complementary energy supply system in park.
关 键 词:多能互补 负荷 供能系统 逐时负荷 设备选型 容量配置 运行策略
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.73.81