某水电站机组运行中远方增有功指令无效原因分析及改进  

Analysis and Improvement of Invalidation of Remote Active Power Instruction in Operation of a Hydropower Station

在线阅读下载全文

作  者:唐世戡 余伟 TANG Shi-kan;YU Wei(Wuling Power Generation Centralized Control Center,Changsha 410000,China)

机构地区:[1]五凌电力发电集控中心,湖南长沙410000

出  处:《通信电源技术》2020年第4期238-239,共2页Telecom Power Technology

摘  要:针对五凌发电集控中心某水电站机组频率达一次调频动作值后,监控系统调整有功指令无效现象,分析目前一次调频和机组AGC或人工增有功存在的配合缺陷。对不匹配问题进行了优化改进,通过试验和实际运行,取得了良好的效果。Aiming at the invalidity of the active power command adjustment of the monitoring system after the frequency of the unit of a hydropower station in wuling power generation control center reaches the action value of primary frequency modulation,the coordination defects of the current primary frequency modulation and unit AGC or artificial active power increase are analyzed,and the mismatch problem is optimized and improved. And through the experiment and the actual operation,has obtained the good result.

关 键 词:水电站 一次调频 AGC 

分 类 号:TV738[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象