检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李威 陈鹏 LiWei;ChenPeng(Shanghai Municipal Engineering Design and Research General Institute(Group)Co.,Ltd.,Shanghai 200092;Nanjing Jiangbei New District Public works Construction Center,Nanjing,Jiangsu,211800)
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092 [2]南京江北新区公共工程建设中心,江苏南京211800
出 处:《工程技术研究》2020年第3期27-28,共2页Engineering and Technological Research
摘 要:某水厂原脱水机房为一单层现浇钢筋混凝土框架结构,房屋内有一根断柱且建设时间已达20年。考虑结构整体安全性问题,文章对此房屋进行抗震分析与评估,并对原结构存在的不足提出抗震加固的措施。Waterworks dewatering room for single-layer Lingqiao reinforced concrete frame structure.There is a broken pillar in the room and the time has been built for 20 years.Taking into account the structure of the overall security issues,in this paper,the seismic evaluation and assessment of the building,and the existing problems of the original structure of seismic reinforcement measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222