检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗雷 王玉琴 魏灵侠 Luo Lei;Wang Yuqin;Wei Lingxia(Suzhou Suqian Industrial Park Environmental Protection Bureau,Suqian Jiangsu 223800,China;Jiangsu Taisite Professional Testing Co.,LTD.,Suqian Jiangsu 223800,China)
机构地区:[1]苏州宿迁工业园区环境保护局,江苏宿迁223800 [2]江苏泰斯特专业检测有限公司,江苏宿迁223800
出 处:《环境与发展》2020年第2期227-228,共2页Environment & Development
摘 要:在开展建设项目自主验收过程中,发现建设项目存在产能设计、环保设施风量不合理及建设内容存在重大变动等问题。针对存在问题提出一些折中解决方案,以期能够给验收工作继续开展提供解决思路,同时期望从业者能够识别焦点问题,能够全过程规范环评设计、审批及竣工环保验收工作。During the self-acceptance of the construction project,it was found that there were problems such as unreasonable capacity design,unreasonable air volume of the environmental protection facilities and major changes in the construction content.The article proposes a compromise solution to the existing problems,in order to provide a solution to the acceptance work,and expects the practitioner to identify the focus,and to standardize the EIA design,approval and completion of environmental protection acceptance.
分 类 号:X32[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26