核电厂移动电站总体设计与验证  

Design and Verification of Mobile Power Station in Nuclear Power Plant

在线阅读下载全文

作  者:张志伟 戴海东 柳志东 赵伟 ZHANG Zhi-wei;DAI Hai-dong;LIU Zhi-dong;ZHAO Wei(Shanxi Diesel Engine Industry CO.,Ld,Datong Gity,Shanvi Pronince.Zip Gode 037036)

机构地区:[1]山西柴油机工业有限责任公司,山西大同037036

出  处:《移动电源与车辆》2019年第4期6-11,共6页Movable Power Station & Vehicle

摘  要:日本福岛事故之后,随着国家对核电厂安全性能要求的不断提高,从加强核电厂应急供电系统可靠性的角度,提出了每个核电厂配备一台2200 kW以上移动电站的方案和措施,以满足应急状态下的使用要求,从而使核电厂的核性能处于安全状态。After the Fukushima accident in Japan,with the continuous improvement of the National requirements for the safety performance of nuclear power plants,from the perspective of strengthening the reliability of the emergeney power supply system of nuclear power plants,a plan and measures have been proposed to meet the requirements for emergency use for each nuclear power plant to be equipped with a mobile power station of 2,200 kW or more.Therefore,the nuclear performance of nuclear power plants is in a safe state.

关 键 词:核电厂 移动电源 设计 验证 

分 类 号:TM611.2[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象