9 m采高采煤机牵引箱加载试验分析  被引量:2

Analysis of Loading Test for 9 m Mining Height Shearer′s Traction Box

在线阅读下载全文

作  者:张晓永[1] Zhang Xiaoyong(Shanghai Branch,Tiandi Science and Technology Co.,Ltd.,Shanghai 200030,China)

机构地区:[1]天地科技股份有限公司上海分公司,上海200030

出  处:《煤矿机械》2020年第2期47-49,共3页Coal Mine Machinery

基  金:中煤科工集团2018年集团重点项目(2018-TD-ZD009)。

摘  要:为了满足9 m采高特厚煤层综采要求,设计了MG1100/3050-WD采煤机。鉴于新牵引箱的结构和参数,选择了倒置的加载方式。采用液压加载试验台进行热平衡试验,并对试验结果进行了分析,满足空载试验和热平衡试验标准和要求。此牵引箱达到型式试验要求,可以出厂进行工业性试验。In order to meet the requirements of fully mechanized mining of 9 m mining height thick seam,the MG1100/3050-WD shearer was designed. In view of the structure and parameters of the new traction box,an inverted loading method was chosen. The heat balance test was carried out using a hydraulic loading test rig and the test results were analyzed. After the no-load test and heat balance test,the traction box meets the type test requirements,and it can be used for industrial test.

关 键 词:牵引箱 9 m采高 液压加载试验台 空载试验 热平衡试验 

分 类 号:TD421.6[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象